Project title:
Building A - passenger terminal of Dubrovnik Airport
Project abbreviation:
ZLD-A
Location:
Čilipi, Konavle
Contract:
public tendering
Project type and phase:
architectural / detailed project
Usage:
traffic / public / business
Project:
2004.-2006.
Construction:
2005.-2006.
Gross area:
12.606 m2
Building footprint area:
4.404 m2
Investor:
Zračna luka Dubrovnik d.o.o., Čilipi
Project:
Arhitektonski biro Ante Kuzmanić d.o.o., Split
Authors:
Ante Kuzmanić, dipl. ing. arh. / Samuel Martin, dipl. Arch. FH
Principal (responsible) architect::
Ante Kuzmanić, dipl. ing. arh.
Project team:
Samuel Martin, dipl. Arch. FH / Mihaela Bašić, dipl. ing. arh. /
Dujmo Žižić, dipl. ing. arh. / Andrej Čikeš, dipl. ing. (FH)
Construction project:
Đuro Nižetić, dipl. ing. građ. / Građevinsko-arhitektonski fakultet, Split
Electrical engineering project:
Nikola Baranović, dipl. ing. el. / Elektro klima projekt d.o.o., Split
Hydroinstallation project:
Ivo Žuvela, dipl. ing. str. / Tub d.o.o., Split
Mechanical installation project:
Vlado Nigojević, dipl. ing. str. / Tub d.o.o., Split
Sprinkler installation project:
Vlado Nigojević, dipl. ing. str. / Tub d.o.o., Split
Fire safety measures:
Ante Kuzmanić, dipl. ing. arh. / Arhitektonski biro Ante Kuzmanić d.o.o., Split
Automatic fire extinguishing system project:
Zdravko Lajić, dipl. ing. str. / Pastor inženjering d.d., Rakitje
Elevator project:
Nikola Cindrić, dipl. ing. str. / Lift-ing d.o.o.
Bill of quantities:
Arhitektonski biro Ante Kuzmanić d.o.o.
Main contractor:
GP Dubrovnik d.d., Dubrovnik
Supervision:
Trames d.o.o., Dubrovnik